Country:
USA/Nigeria
Client:
Kellogg, Brown & Root (KBR)
Description of Work:
Detailed engineering of the following
Date Won:
January 2005
Status:
Completed
Nigeria
Technip-Coflexip
Detailed design of portions of Living Quarters Jacket & Piles, Connecting Bridges, and Flare & Tripod Jacket and PilesThe East Area Project is intended to gather and compress gas from the Offshore East Area fields, extract NGL and recompress the .gas for pressure maintenance and artificial oil lift through the operational Idaho, Ubit and Edop offshore platforms.
July 2003
Saipem S.A.
Detailed engineering of the following topsides facilities;Piperack, Dummy Skid Laydown Module, Flare Tower, Stair Tower, Riser Protection Structure, Flare Knockout Drum & Test Separator, and Water Injection Module.
September 2002
Mobil Producing Nigeria Limited (MPN)
Detailed engineering of a 2.5 km subsea'pipeline running between Asabo C and Asabo D wellhead platforms offshore Qua Iboe Terminal.
September 2001
Nigeria/France/USA
Siolt Offshore (now ACERGY)
Participation in the detailed engineering of the following:
April 2001
AMEC
Detailed engineering of three Modules of the Topsides. These are the Flare Boom Module, the Laydown Module and the Sales Gas Metering Module. Analyses performed by NETCO for the flare module include:
February 2001